Bolted the heads down on the block so I can start to see where various things need to go! Photos soon.

Meanwhile for a break from the metal fabrication, its seeing if I can get the heater to fit time!

First the "air inlet assembly ducting" as its called in the shop manual.
This thing


Here's a temporary fit and you can see where the bottom of it is touching the firewall before it sits flush



So I need to cut the bottom off so it has a chance of sitting flush.

Here's the cut line planned to completely flatten the bottom





Here's my airsaw in action


Here's the bottom cut off flat



And a side view looking across the bottom showing the flat profile



I'll make a new base and bond it in, then produce a water drain hole.
Then its onto the other heater boxes...
Andy.
_________________________
www.lowcamaro.com